|
![]() |
|
|
TheFirearmsForum.com
FOUNDED: February 9, 2001 |
If you prefer to make a donation by check,
send an email to Support for the mailing address. |
|
|
#1 |
|
Former Guest
Join Date: Jan 2010
Location: Australia
Contributor
Posts: 17,622
|
http://gsaauctions.gov/gsaauctions/aucitsrh/
BID DEPOSIT-SEA SHADOW/HMB-1 Sale-Lot Number:31QSCI12129001 State: CA Current Bid: 90,100 USD Bidders: 5 Close Time: 05/04 05:00 PM CT * Time Remaining: 7 Days, 9 Hours, 21 ------------------------------------------------------------------ THE FOLLOWING ITEMS ARE BEING SOLD AS ONE LOT AND ARE NOT TO BE SEPARATED UNTIL AFTER THEY HAVE BEEN REMOVED FROM THE GOVERNMENT FACILITY. ![]() THE EX-SEA SHADOW (IX-529), YEAR BUILT: 1983, BUILDER: LOCKHEED MARTIN, OVERALL LENGTH: 164 FEET, WATERLINE LENGTH: 118 FEET, EXTREME BEAM 68 FEET, WATERLINE BEAM: 58 FEET, MAXIMUM NAVIGATIONAL DRAFT: 15 FEET, DRAFT LIMIT: 15 FEET, LIGHT DISPLACEMENT: 499 TONS, HULL MATERIAL: STEEL HULL AND SUPERSTRUCTURE, DIESEL ELECTRIC PROPULSION SYSTEM, NUMBER OF PROPELLERS: TWO. (THE EX-SEA SHADOW SHALL BE DISPOSED OF BY COMPLETELY DISMANTLING AND SCRAPPING WITHIN THE U.S.A. DISMANTILING IS DEFINED AS REDUCING THE PROPERTY SUCH AS IT HAS NO VALUE EXCEPT FOR ITS BASIC MATERIAL CONTENT.) THE EX-HUGHES MINING BARGE (HMB-1), COVERED SEMI-SUBMERSIBLE DECK CARGO BARGE/FLOATING DRY-DOCK (WITH DOCKED EX-SEA SHADOW (IX-529) ON BOARD.) HMB-1 - LIGHT DISPLACEMENT: 4,585 TONS, LENGTH OVER ALL): 324 FEET, BREATH: 106.8 FEET, DEPTH: 18.8 FEET, HEIGHT OF WING WALLS ABOVE MAIN DECK: 62 FEET, LENGTH INSIDE WING WALLS: 276 FEET, WIDTH INSIDE WING WALLS: 76.6 FEET, YEAR BUILT: 1972, DRAFT: FORWARD: 8 FEET, AFT: 9 FEET, AIR DRAFT: 97.7 FEET, BUILDER: NATIONAL STEEL SHIP BUILDING COMPANY, SAN DIEGO, CA., CONSTRUCTION: WELDED STEEL, SPOON BOW AND FLAT BOTTOM WITH 18 INCH DEAD RISE, AND RADIUS BILGE PLATING. THESE ITEMS ARE BEING SOLD AS ONE LOT AND WILL NOT BE SEPERATED. IN ORDER TO BID ON THIS LOT, BIDDERS WILL NEED TO REQUEST A BID BUTTON BY PROVIDING A BID DEPOSIT IN THE AMOUNT OF $10,000, AND A SIGNED COPY OF THE ATTACHED STATEMENT OF INTENT (COMPLETELY FILLED OUT). BIDDERS MUST AGREE TO ALL OF THE TERMS AND CONDITIONS ON THE STATEMENT OF INTENT. IF ANY TERM OR CONDITIONS IS NOT AGREED TO OR IF NO BID DEPOSIT IS PROVIDED, BIDDERS WILL BE CONSIDERED NON-COMPLIANT AND NO BID BUTTON WILL BE ASSIGNED. ADDITIONALLY, BIDDERS WILL NEED TO BE REGISTERED ON GSAACUTIONS(SM) IN ORDER TO RECEIVED A BID BUTTON AND WILL NEED TO SUPPLY THEIR ON-LINE USER NAME, THE REGISTERED E-MAIL ADDRESS, A DAYTIME TELEPHONE NUMBER, THEIR REGISTERED NAME AND MAILING ADDRESS. THE BID DEPOSIT MUST BE IN THE FORM OF AN ACCEPTABLE CREDIT CARD, CASHIERS CHECK OR MONEY ORDER AND ALL REQUIRED INFORMATION MUST BE RECEIVED BY 1:00 P.M. CST ON FRIDAY, MAY 4, 2012. CREDIT CARD DEPOSITS CAN BE CALLED INTO GSA AT 215-446-5065. CASHIERS CHECKS OR MONEY ORDERS MYST BE OVERNIGHTED TO GSA, PROPERTY, ATTN JOHN LUBESKI, STRAWBRIDGES BUILDING, 10TH FLOOR, 20 NORTH 8TH STREET, PHIALDELPHIA, PA 19107. ALL DEPOSITS FOR UNSUCCESSFUL BIDDERS WILL BE RETURNED TO THE BIDDER WITHIN 3 BUSINESS DAYS OF THE CLOSING OF THE SALE. ONCE THE SALE HAS BEEN AWARDED, THE SUCCESSFUL BIDDER MUST SUBMIT BALANCE OF PAYMENT AND A COPY OF THE ATTACHED PERFORMANCE BOND (SF25) IN AN AMOUNT OF NOT LESS THAN $500,000, WITHIN 10 BUSINESS DAYS. IF PAYMENT AND/OR SF25 IS NOT RECEIVED, SUCCESSFUL BIDDER WILL BE CONSIDERED IN DEFAULT OF THIS CONTRACT. TEN (10) DAYS NOTICE IS REQUIRED TO SCHEDULE INSPECTION AND/OR REMOVAL. PLEASE PLAN ACCORDINGLY. THIS SALE HAS BEEN EXTENDED TO 21 DAYS TO ACCOMIDATE THE 10 DAY INSPECTON REQUIREMENT. *****PLEASE NOTE THIS SOLICITATION WAS UPDATED ON WEDNESDAY, APRIL 25, 2012 TO CORRECT THE LENGTH (OVER ALL) FOR THE EX-HMB-1. THE CORRECT LENGTH (OVER ALL) OF THE EX-HMB-1 IS 324 FEET. ADDITIONALLY, THE TIME-FRAME FOR SUBMITTING STATEMENT OF INTENTS AND BID DEPOSITS HAS BEEN EXTENDED TO FRIDAY, MAY 4, 2012, 1:00 P.M. CST. N0002412520001 THE CONDITION OF THE PROPERTY IS NOT WARRANTED. Additional Documents SF 25 Hull Thickness doc 2 Hull Thickness doc 1 Hull Thickness doc 3 Survey Reports Statement Of Intent Click here for pricing guides. SPECIAL INSPECTION INFORMATION INSPECTION AND REMOVAL BY APPOINTMENT ONLY. CONTACT PROPERTY CUSTODIAN TO SCHEDULE AN APPOINTMENT. THIS IS A BID DEPOSIT SALE. SEE DESCRIPTION AND ATTACHMENTS FOR TERMS. Please contact the custodian for inspection dates and times and for removal arrangements. ---------------------------------------------------- 200 million dollar boat 50 million floating dry dock and top bid is $90 grand , hmmmmm..
-->
Last edited by jack404; 04-27-2012 at 07:42 AM.. |
|
|
|
|
|
#2 |
|
V.I.P. Member
Join Date: Mar 2012
Location: Pittsburgh, Pa
Posts: 166
|
No wonder my taxes are so high...
__________________
"I don't like the idea of gettin' shot in the hand" - Blackie from "Rustler's Rhapsody" |
|
|
|
|
|
#3 |
|
Former Guest
Join Date: Jan 2010
Location: Australia
Contributor
Posts: 17,622
|
i'm wondering what the heck would happen if the people smugglers here got that for 100 K , they could fit 500 on board and charge 10 grand a seat and we'd not know unless we saw it with eyeball mark 1 , as radar would be useless
|
|
|
|
|
|
#4 |
|
Former Guest
Join Date: Apr 2012
Location: Goose Creek SC
Posts: 117
|
Lockheed Martin paid me top dollar for 33 yrs and now pays me and thousands of others nice retirements.......The "Sea Shadow" was a proof of concept that worked very well and much of what was learned is now being applied to new surface assets......Much like the U 2, YF 12, and "F"117; the technology went on to better applications for future weapons............
Don't bad mouth Lockheed Martin and the many other big defence contractors.......Many thousands of good Americans get nice pay checks and the nation needs the continuous services provided by these companies to maintain a strong defence against this evil world..... Dan |
|
|
|
|
|
#5 |
|
Senior Member
Join Date: Aug 2008
Location: Near Fairbanks
Posts: 697
|
Well, it is to be totally dismantled. I have heard
that one of the problems with it was due to severe corrosion. As far as a waste of money, we are the champs ! Go, U.S.A. ! |
|
|
|
|
|
#6 |
|
Former Guest
Join Date: Apr 2012
Location: Goose Creek SC
Posts: 117
|
http://telstarlogistics.typepad.com/...alth-ship.html
It was contracted to be a test bed and fulfilled that function......As I said before, a lot of paychecks for American workers came from the building of this ship.......Better than sending money "foreign aid" to countries that hate America. As an after thought: American workers will earn pay checks to dismantle it hopefully!!! Last edited by Dan01; 04-27-2012 at 09:44 AM.. |
|
|
|
![]() |
| Thread Tools | |
|
|